Name of the Project :

Al-Udeid Project - Package 4 Addendum No. 1

(Z-105-05A) Design and Build Contract.

 
Client : M/s. Qatar Armed Forces Qatar
Scope of Work : 

Works include the Design, Supply, Installation, Testing, Commissioning and Maintenance of all MEP Works for (30) Facilities under Addendum No.1 (Z-105-05A) for Qatar Armed Forces. Project covers HVAC - Chilled water piping, Valves & Fittings, Duct work support & Insulation, AHU's, Exhaust Fans, DX Units, Grilles&Diffusers, Chillers,Chilled Water Pumps, Electrical works for HVAC System, Flushing Chilled Water System ;Plumbing & Drainage:- Internal Soil,waste&vent piping,Floor & Roof Drains, Hot & Cold Water piping & Valves, Inline Pumps, Sanitary Fixtures, Electric Water Heaters; Fire Fighting:- Sprinkler Piping, Valves, Supports, Sprinkler Heads, Fire Extinguishers; Electrical & Fire Alarm:- DB's, Cables & Wires, Conduits, Internal Light Fittings, Fire Alarm Panel & Wiring, Telephone Outlets, Communication System etc.

 

Start Date :

1-May-2003
End Date : 31-July-2006