Name of the Project :

Al-Udeid Project - Package 4 Addendum No. 2

(Z-105-05B) MEP works for Provision of Utilities and Infrastructure works related to Addendum No.1 and Millenium Village Part I Facilities (Z105-05C)

 
Client : M/s. Qatar Armed Forces Qatar
Scope of Work : 

Design, Supply, Installation, Testing, Commissioning and Maintenance of Electrical, Mechanical & Plumbing works for Pumping stations, Water supply system, Water Reservoirs,Services inside sub stations, Street Lighting, Rising Mains etc. Activities in brief: Installation of HV Switchgear, Transformers, MV Panels-Generator Incomer, ATS & Bus couplers, Installation of street light poles and fixtures and related cables & accessories, G.I. Conduits, Flexible Metallic & Accessories, Isolating Switches, Ventilation Fans, Light Fightings Type C&C/E, Fire Hydrants, Wires & Cables, Fire Alarm System, Window A/C Units, Fire Fighting & Water Network System, Sanitary Wares & Accessories, Copper Pipes & Fittings, Pipes & Fittings for Domestic Water System, For Pumping Stations Installation of Submersible Sewage Lifting Pumps, Odor Controlling system, Surge vessel & extra fans, Penstocks etc. & related electrical works.

 

Start Date :

1-Dec-2005
End Date : 29-Feb-2008